A reader recently expressed concern about the 805 bridge over I-8 in Mission Valley. Councilmember Donna Frye asked for information from Caltrans. The bridge was built in 1972 and last inspected on Nov. 29, 2006. The northbound span is structurally sound with minor cracking on the deck. The southbound span is structurally sound with minor cracking and a rebar exposed on the deck. The next comprehensive report will be in the fall of 2008. Best, Don Bauder
A reader recently expressed concern about the 805 bridge over I-8 in Mission Valley. Councilmember Donna Frye asked for information from Caltrans. The bridge was built in 1972 and last inspected on Nov. 29, 2006. The northbound span is structurally sound with minor cracking on the deck. The southbound span is structurally sound with minor cracking and a rebar exposed on the deck. The next comprehensive report will be in the fall of 2008. Best, Don Bauder