Sand and water is pumped out of a pipe from the offshore ship Liberty Island and spread on the beach at Imperial Beach by bulldozers as part of the $28.5 Million Sand Replenishment Project.
September 9, 2012
Sand and water is pumped out of a pipe from the offshore ship Liberty Island and spread on the beach at Imperial Beach by bulldozers as part of the $28.5 Million Sand Replenishment Project.
September 9, 2012